Quality is checked in process, not at the end
Four control points sit between incoming material and the export carton. Each one is recorded against the work order, so a claim can be traced back to the batch that made it — and to the crimp sample taken from it.
- ISO 9001
- CE
- RoHS
- REACH
Four gates before packing
- 01
Incoming inspection
Contact blanks, insulators, shells and wire checked against drawing and material certificate before release to production.
- 02
In-process control
Plating thickness, insertion force and crimp height sampled per lot and recorded against the work order.
- 03
Electrical test
100% continuity and hipot on every assembly; contact resistance and insulation resistance logged for high-reliability parts.
- 04
Sealing test
IP67/IP68 samples pressure-decayed per lot; IP69K verified on request with a washdown report.
- 05
Mating cycle test
Push-pull and M-series parts cycled to the rated count, with contact resistance measured before and after.
- 06
Final inspection
AQL sampling on appearance, dimensions and labelling before export packing.
What we measure with
-
Continuity / hipot tester
Every assembly is checked for continuity against its wiring table. High-current and high-voltage parts also get a dielectric withstand test.
-
Crimp force and height gauge
Crimp height measured on a sample per batch, with pull-force tested on a tension meter and recorded against the work order.
-
Contact resistance meter
Milliohm measurement on high-current contacts — the difference between a 0.4 mΩ and a 2 mΩ joint is heat in service.
-
Visual and dimensional inspection
AQL sampling on appearance, dimensions, labeling and packing before the carton is closed.
Traceability
A claim is only answerable if the batch can be found. Every order carries a batch number, and the records that matter are filed against it rather than against the month.
- Batch number printed on the carton and the inner bag
- Crimp sample records kept against the work order
- Wire and terminal certificates of conformance filed by batch
- Drawings and revisions controlled; the revision in force is printed on the label
If something does go wrong
Send the batch number and photos of the defect. We pull the crimp records for that batch, identify whether the fault is material, tooling or assembly, and reply with a containment and replacement plan — normally within two working days.
Report an issueNeed our certificates for your file?
ISO 9001, CE, RoHS and REACH declarations are available on request.